Data Server Room Application

The Challenge The main emphasis of this project was to supply an air conditioning solution that was both resilient and could provide sufficient cooling capacity to each server room.

Read more

Phoenix House Offices

The Challenge: Eight Toshiba heat recovery VRF systems, operating with R410A, were installed at the striking large office block in Slough to meet a requirement to make the most of the north-south orientation of the building to save energy.

Read more