Menu

Largest Mercedes Benz Facility in the UK to be Cooled by Toshiba’s Best-in-Class VRF System

A new state-of-the-art Mercedes-Benz retail centre now under construction will be air conditioned with Toshiba’s award-winning Super Heat Recovery Multi (SHRM-e) variable refrigerant flow (VRF) system. Located on a 10.5-acre site near Stockport, the development will be the largest Mercedes-Benz facility in the UK, and includes the brand’s largest showroom in Europe, 32 workshop bays […]

Read more

Multitone Electronics Offices

A major project to upgrade and replace air conditioning at communications specialist Multitone Electronics was made possible by a creative phased installation of a high efficiency Toshiba system. The Basingstoke-based company asked HVAC and maintenance contractor Comfort Building Services to replace its existing air conditioning system, which consisted of independent split systems installed on an […]

Read more

Phoenix House Offices

The Challenge: Eight Toshiba heat recovery VRF systems, operating with R410A, were installed at the striking large office block in Slough to meet a requirement to make the most of the north-south orientation of the building to save energy. The Challenge Eight Toshiba heat recovery VRF systems, operating with R410A, were installed at the striking […]

Read more

Data Server Room Application

The Challenge The main emphasis of this project was to supply an air conditioning solution that was both resilient and could provide sufficient cooling capacity to each server room. As the air conditioning systems provided cooling for critical server rooms they needed to be able to operate with an N+1 resilience in the event of […]

Read more