Menu

Mallard House Offices

Through active communications with Mark Ellis of Morgan Lovell, Toshiba were able to provide an alternative true VRF Heat Recovery solution for Mallard House, installed by Airmaster. Although Toshiba was not originally specified for the project, the energy efficiency and cost savings of the equipment meant that Toshiba was the obvious choice. Toshiba understand the […]

Read more

Phoenix House Offices

The Challenge: Eight Toshiba heat recovery VRF systems, operating with R410A, were installed at the striking large office block in Slough to meet a requirement to make the most of the north-south orientation of the building to save energy. The Challenge Eight Toshiba heat recovery VRF systems, operating with R410A, were installed at the striking […]

Read more